Petal was selected to fitout washrooms in this prestigious business centre.
Petal’s latest flush fronted inline cubicles were selected for this new build office development in Dublin’s prime City West location.
The Line configuration provides an excellent balance between value and performance by providing enhanced levels of privacy without the added costs of a full floor to ceiling system. The Lake Drive specification included bespoke polished chrome fittings throughout.
028 6862 1766
sales@petal.co.uk