Newry Leisure Centre

Petal provided changing and washroom facilities designed for use by individuals, family and schools groups, each one tailored to the user’s specific needs regarding secure storage, privacy and comfort.

Only the most robust systems are capable of providing long lasting trouble-free performance in high traffic sports facilities which experience extremes in humidity, temperature and cleaning regimes. Our 10 year warranty demonstrates Petal’s professional ability in the supply and fit of high performance cubicle and washroom systems.

“ Petal made a major contribution to the overall success of the project, supplying and fitting cubicle and changing systems throughout the complex. We are delighted with the finished results.”
– Mark Campbell MCIOB, Contracts Director Main Contractor, Felix O’Hare & Co.

Newry Leisure Centre

Contract

  • Sector
    Sports and Leisure
  • Project Names
    Newry Leisure Centre
  • Contractor
    Felix O’Hare & Co
  • Client
  • Architect
    Kennedy & Fitzgerald
  • Range
    Action Cubicles and Lockers
  • Cubicle System
    Action fully framed free standing cubicles
  • Duct Pannelling
    Petal P300 metal framed panel system
  • Vanity System
    Petal bespoke vanity

Wet Changing – Pool Village
The fully framed Action Cubicle system brings versatility for freestanding areas configured for individual or family changing, showering and WC cubicles. The pool village washrooms also feature solid surface vanity tops with under counter basins and Duct access paneling for the optimum wet room solution.

Designed for use in the wet, the Action lockers feature aluminium bodies, high impact polymer components and CGL doors. The practical coin return system specified on these lockers is the ideal solution for a busy sports and leisure facility.

Washroom and toilet areas
Petal provided fitted washroom and toilet areas throughout the complex utilising the Action cubicle, bespoke vanities and duct paneling. Every component used in the project has been designed to last. Our wall paneling system consists of factory assembled robust metal frames combined with compact grade laminate, the ideal solution for use in a damp environment.

Group Changing
The center contains a range of changing options including group changing. Petal’s wall mounted Action benching and hanging facilities provide a low maintenance, easy cleaning solution, essential in every modern facility.

Call or speak to a member of our sales team today